Back issues

archives: Volume 26, Number 1

January 2009

Journal of the Chinese Institute of Industrial Engineers.

ISSN 1017-0669

Vol.26 No.1

1.
DESIGNING A HANDLED TRACKBALL FOR SEATED COMPUTER TASKS
Chiuhsiang Joe Lin Chi-No Liu Jun-Lung Hwang Wei-Jung Shiang pp.1-10
Abstract
2.
ENHANCEMENT OF SERVICE QUALITY IN INTER-NET-MARKETING THROUGH APPLICATION OF THE SIX SIGMA PROCESS
Tai-Chang Hsiau Shui-Chuan Chen Kun-Sheng Chen pp.11-21
Abstract
3.
DISCOMFORT AFTER PLAYING DRUMMING GAMES
Chi-Ling Huang Chih-Wei Lu Mei-Lan Lo Pet-Hsun Lin pp.22-31
Abstract
4.
Simultaneous Pricing, Due-Date Setting and Scheduling for Make-To-Order Firms with Contingent Orders
Shu-Chu Liu Chun-Hui Liu pp.32-43
Abstract
5.
Complexity Estimation for Genetic Assembly Sequence Planning
Wen-Pai Wang Hwai-En Tseng pp.44-52
Abstract
6.
An Economic Design of Tukey's Control Chart
Chau-Chen Torng Pei-Hsi Lee Chun-Chieh Tseng pp.53-59
Abstract
7.
Tool Portfolio Planning in the Back-End Process of Wafer Fabrication with Sequential Time Constraints
Ying-Mei Tu Hsin-Nan Chen pp.60-69
Abstract
8.
An Optimal Policy for CSP-1 with Inspection Errors and Return Cost
Tien-Yu Lin Hong-Fwu Yu pp.70-76
Abstract