Back issues

archives: Volume 25, Number 2

March 2008

Journal of the Chinese Institute of Industrial Engineers.

ISSN 1017-0669

Vol.25 No.2

1.
Solving the Economic Lot Scheduling Problem with Identical Facilities in Parallel Using Genetic Algorithms
Yu-Jen Chang Ming-Jong Yao pp.91-104
Abstract
2.
A Heuristic Algorithm for Hybrid Flow-Shop Production Scheduling to Minimize the Sum of the Earliness and Tardiness Costs
Mehdi Heydari M.B. Fakhrzad pp.105-115
Abstract
3.
Reliability Optimization of a Non-Repairable Compound Series-Parallel System
Chung-Ho Wang Yi Hsu pp.116-126
Abstract
4.
The Design of Acceptance Control Chart for Non-Normal Data
Tzong-Ru Tsai Jyun-You Chiang pp.127-135
Abstract
5.
Scheduling for a Single Semiconductor Batch-Processing Machine to Minimize Total Weighted Tardiness
Fuh-Der Chou Hui-Mei Wang pp.136-147
Abstract
6.
Application of Novel Numerical Definition-Based Systematic Approach (Ndsa) to the Design of Knife Forms
Yu-Ming Chang Hung-Yuan Chen pp.148-161
Abstract
7.
Weighted Least-Square Esimate for Software Error Intensity
Show-Long Patrick Koh pp.162-173
Abstract
8.
Inward Beliefs in High Technological Performance: An Empirical Study
Wei-Chin Wei pp.174-186
Abstract