Back issues
archives: Volume 22, Number 4
July 2005
Journal of the Chinese Institute of Industrial Engineers.
ISSN 1017-0669
Vol.22 No.4
|
|
|
|
|
|
|
|
|
| 1.
|
An Interactive Tool Based on XML Technology for Data Exchange between Heterogeneous ERP Systems
| Wei-Jung Shiang and Ming-Ying Ho pp.273-281 |
| Abstract | PDF Full-Text (471 KB) | |
|
| 2.
|
Enhance Order Promising with ATP Allocation Planning Considering Material and Capacity Constraints
| James T. Lin and Juin-Han Chen pp.282-292 |
| Abstract | PDF Full-Text (541 KB) | |
|
| 3.
|
A Study of The Impact of Activity Overlapping on Development Lead-Time in Design Chain
| Juite Wang and Y.-C Hwang pp.293-300 |
| Abstract | PDF Full-Text (300 KB) | |
|
| 4.
|
|
| 5.
|
Collaborative Design Model Planning with a Design Module Formation and Design Task Assignment Model
| Yuan-Jye Tseng, Huei-Ling Tzeng and Yu-Hua Lin pp.309-317 |
| Abstract | PDF Full-Text (168 KB) | |
|
| 6.
|
Using Technology and Management Patterns Approach to Examine the Business Performance of Taiwan’s Logistic Firms
| Shu-Yi Liaw and Yu-Fang Wang pp.318-331 |
| Abstract | PDF Full-Text (310 KB) | |
|
| 7.
|
A Design Methodology for Converting a Regular Warehouse into a Zone-Picking Warehouse
| Ying-Chin Ho and Chi-Fong Liu pp.332-345 |
| Abstract | PDF Full-Text (263 KB) | |
|
| 8.
|
A Process Parameters Determination Model by Integrating Artificial Neural Network and Ant Colony Optimization
| Chwen-Tzeng Su, Jui-Tsung Wong and Shang-Chun Tsou pp.346-354 |
| Abstract | PDF Full-Text (415 KB) | |
|