Backnumber archives

archives: Volume 20, Number 6

November 2003

Journal of the Chinese Institute of Industrial Engineers.

ISSN 1017-0669

Vol.20 No.6

1.
Optimal Preventive Warranty Policy for Products under Maintenance Resource Constraints
Ruey-Huei Yeh, Ming-Yuh Chen and Gaung-Cheng Chen pp.545-552
Abstract
2.
Model Structure and Solution Procedures for Variable Sublots of a Single Product in a Flow Shop
Shu-Chu Liu and Tai-Shin Liu pp.553-564
Abstract
3.
Solution Models Construction for Open Shop Scheduling Problem with Setup, Processing, and Removal Times Separated
Chinyao Low, Jinn-Yi Yeh and Fang-Wu Low pp.565-574
Abstract
4.
Booking Capacity Planning for Fabless
Shih-Chou Hsu, Wei-Hua Wang and Ching-En Lee pp.575-598
Abstract
5.
Research on the E-Business Environmental Factors for Taiwan Electronic Enterprise Concerning Taiwan and China
Ron Shih and Dah-Chuan Gong pp.599-613
Abstract
6.
Flexible Exracting and Fitting of the Feature Lines of a 2D Graph D
er-Baau Perng and Shao-Fang Wen pp.614-624
Abstract
7.
Genetic Algorithm Based Semiconductor Manufacturing Process Controller for Chemical Mechanical Planarization
Jinn-Yi Yeh and Bau-Hsien Huang pp.625-635
Abstract
8.
Vehicle Scheduling Problem at a Cross-Docking Terminal
Ching-Jung Ting and Wei-Lun Weng pp.636-650
Abstract
9.
Solving Vehicle Routing Problem with Backhauls
Tai-Hsi Wu and Jeng-Fung Chen pp.651-665
Abstract
10.
Examining Groupthink Phenomenon for The Decisions Made to Invest in Mainland China: An Empirical Study of Taiwan’s Enterprises
Chi-Kuang Chen, Kuo-Chin Shu and Cheng-Ho Tsai pp.666-678
Abstract