Backnumber archives
archives: Volume 20, Number 5
September 2003
Journal of the Chinese Institute of Industrial Engineers.
ISSN 1017-0669
Vol.20 No.5
| 1.
|
On the Feasibility Testing of the Economic Lot Scheduling Problem Using the Extended Basic Period Approach
| Ming-Jong Yao, Salah E. Elmaghraby and Ing-Chine Chen pp.435-448 |
| Abstract |
|
| 2.
|
Optimal Lot-sizing Policy for Time-Varying Demand with Shortages and Deterioration
| Sheng-Pen Wang pp.449-456 |
| Abstract |
|
| 3.
|
Study on Wafer Rework Strategies and Dispatching Rules at The Photolithography Stage
| Yung-Jye Sha, Ling-Feng Hsieh and Shih-Hsing Lin pp.457-464 |
| Abstract |
|
| 4.
|
Develop a Methodology for Evaluating a Hybrid 3D Noncontact Measurement System Capability
| Bernard C. Jiang and Tong-Jou Hsueh pp.465-471 |
| Abstract |
|
| 5.
|
An Ergonomic Assessment of Four Female Shoes: Friction Coefficients of the Soles on the Floors and Electromyographic Activities in the Shank When Walking
| Kai Way Li pp.472-480 |
| Abstract |
|
| 6.
|
Processes Control for Two Failure Mechanisms
| Su-Fen Yang and Yen-Chung Chen pp.481-493 |
| Abstract |
|
| 7.
|
Statistical Assisted Fuzzy-Nets Based In-Process Surface Roughness Prediction (S-Fn-Ipsrp) System in End Milling Operations
| Lieh-Dai Yang and Joseph C. Chen pp.494-510 |
| Abstract |
|
| 8.
|
Optimun MRR Control and Production Due-date Assignment for Multiple Machining Projects in A Deterministic Interval
| Long-Jyi Yeh and Tian-Syung Lan pp.511-521 |
| Abstract |
|
| 9.
|
Throughput Analysis using Alternating Renewal Process in Balanced Serial Production Lines with no Interstage Buffers
| Chin-Tai Chen and John Yuan pp.522-532 |
| Abstract |
|
| 10.
|
Optimal Burn-in Time and Eventually IFR
| Jie-Mi pp.533-543 |
| Abstract |
|