Backnumber archives
archives: Volume 20, Number 3
May 2003
Journal of the Chinese Institute of Industrial Engineers.
ISSN 1017-0669
Vol.20 No.3
| 1.
|
Rapid Manufacturing in the 21th Century
| Denis Cormier, Ola Harrysson and Tushar Mahale pp.193-201 |
| Abstract |
|
| 2.
|
Analyzing Large-Scale Imprecise Concurrent Engineering Systems
| Tong (Teresa) Wu and Peter O’Grady pp.202-215 |
| Abstract |
|
| 3.
|
An Iterative Set-Covering Procedure for Assigning Emergency Project Tasks
| Samuel A. Awoniyi pp.216-219 |
| Abstract |
|
| 4.
|
An Information Processing Model for Human-Computer Integrated Assembly Planning Systems
| Nong Ye pp.220-229 |
| Abstract |
|
| 5.
|
Models for Supply Chain Vendor Selection in E-Markets
| Sanchoy K. Das and Hossam Shahin pp.230-238 |
| Abstract |
|
| 6.
|
Rapid Prototyping as an Integrated Product/Process Development Tool an Overview of Issues and Economics
| Matthew Frank, Drs. Sanjay B. Joshi and Richard A. Wysk pp.239-245 |
| Abstract |
|
| 7.
|
Tolerance Analysis Based Computer-Aided Setup Planning
| Yuyun Zhang, W. Hu and Yiming Rong pp.246-256 |
| Abstract |
|
| 8.
|
Usability Comparison: Similarity and Differences Between E-Commerce and World Wide Web
| Enlie Wang, Barrett S. Caldwell and Gavriel Salvendy pp.257-265 |
| Abstract |
|
| 9.
|
E-Manufacturing: the Keystone of a Plant-Wide Real Time Information System
| Robin G. Qie pp.266-274 |
| Abstract |
|
| 10.
|
Integrating Fuzzy Logic into Quality Function Deployment for Product Positioning
| Chang Lin Yang and Hsiao Hua Fang pp.275-281 |
| Abstract |
|
| 11.
|
Effect of Activity Schedulings and Inventory Control: an Experimental Investigation for PC Assembly
| Abhyuday A. Desai and Yung-Nien Yang pp.282-294 |
| Abstract |
|
| 12.
|
An Evaluation of the CDs Heuristic in Flow Shops with Multiple Processors
| Wei Wang and John L. Hunsucker pp.295-304 |
| Abstract |
|