Backnumber archives
archives: Volume 18, Number 5
September 2001
Journal of the Chinese Institute of Industrial Engineers.
ISSN 1017-0669
Vol.18 No.5
| 1.
|
A Bottleneck-Based Group Scheduling Procedure for Job-Shop Cells
| By Yu-Chang Chen and Ching-En Lee pp.1 -12 |
| Abstract |
|
| 2.
|
Feature Investigation in a Learning Process
| By Long-Shuh Lin and Hsiao-Fan Wang pp.13 -22 |
| Abstract |
|
| 3.
|
A Single-Vendor Multi-Buyers Integrated Inventory Policy for a Deteriorating Item
| By Po-Chung Yang and Hui-Ming Wee pp.23 -30 |
| Abstract |
|
| 4.
|
VDT Workstation Preferred Settings: Comparison Between PC and CAD Workstation for Taiwanese Users
| By Wen-Hsin Hsu and Mao-Jiun Wang pp.31 -38 |
| Abstract |
|
| 5.
|
Heuristic for Scheduling in a Bicriteria Single Machine Problem
| By Ling-Huey Su and Fuh-Der Chou pp.39 -46 |
| Abstract |
|
| 6.
|
Solving Multi-Response Problems through Neural Networks and Principal Component Analysis
| By Chih-Ming Hsu pp.47 -54 |
| Abstract |
|
| 7.
|
Using Evolutionary Computation Approach to Improve the Performance of the Fuzzy-Art for Grouping Parts
| By Sung-Youl Lee and Ta-Cheng Chen pp.55 -62 |
| Abstract |
|
| 8.
|
A Study of Examining the Causal Relationships of Group Polarization Effect under a Small Group Decision Situation
| By Chi-Kuang Chen, David H. Gustafson and Yuan-Duen Lee pp.63 -75 |
| Abstract |
|
9.
|
The Design of a Fuzzy Logical Vigilance Performance Alarm System for Automation Supervisory Control Tasks
| By Cheng-Li Liu and Sheue-Ling Hwang pp.76 -86 |
| Abstract |
|
10.
|
A Compromise Model for Solving Fuzzy Multiple Objective Linear Programming Problems
| By Yan-Kuen Wu and Sy-Ming Guu pp.87 -93 |
| Abstract |
|