OPTIMAL SCHEDULING IN COLOR FILTER MANUFACTURING

Shyh-Huei Chen*, Chih-Kai Chang, Che-Liang Kuo

Department of Industrial Engineering and Management

National Yunlin University of Science and Technology

ABSTRACT

A scheduling problem of the color filter manufacturing in TFT LCD industry is considered in this paper. The problem under consideration is a flow shop scheduling problem with sequence-dependent setup times. The objective is to schedule the order completion times as close to the due dates as possible to minimize the earliness/tardiness penalties, subject to the production capacity constraints and fulfillment of production demands. A modified ant colony optimization (ACO) approach is proposed to find the optimal schedule for this problem. The proposed approach was designed to focus on the practical requirements in the color filter process.

Keywords: ant colony optimization, color filter process, earliness/tardiness penalties, flow shop scheduling, setup times

(*Contact: E-mail chensh@yuntech.edu.tw )

Cite this article as: Shyh-Huei Chen, Chih-Kai Chang and Che-Liang Kuo, "Optimal Scheduling in Color Filter Manufacturing," Journal of the Chinese Institute of Industrial Engineers, 22, 301-308 (2005).